Project Detail
The project, whose construction started in the Bolvadin district of Afyonkarahisar city of Turkey at the beginning of 2021 and was put into operation in the same year, is a 12 MW power plant that will produce energy based on plant and forest waste.
As Sirius, all Manufacturing & Installation works have been carried out in the Bolvadin Biomass Facility installation and the plant has been put into operation.
Employer: Nature Energy
Contractor : Sirius Industry
Sector : Power Plant
Location : Bolvadin – Afyonkarahisar – Türkiye
Project Duration : 2021
Project Status : Completed
License Capacity : 12,7 MW
The Work Done :
-
- Biomass Power Plant Mechanical Works Erection & Pipe Manufacturing Erection – 526 tons