Project Detail
The source of feed gas for the project will be ethane-rich natural gas produced by Gazprom from Achimov and Valanginian deposits within the fields of the Nadym-Pur-Taz region.
The complex will produce sales gas (C1), LNG (C1), LPG (C3-C4), ethane (C2) and pentane-hexane (C5+) fractions.
The cluster is constructed near Ust-Luga (Leningrad region, Russia). It covers the area of approximately 1400 hectares. During its most active phase, the construction will involve over 25,000 specialists, with more than 5,000 permanent jobs to be created to man the operation of the facilities.
Performance targets
Processing:
• 45 bln cubic meters of gas per annum
Production:
• ≈ 19.5 bln cubic meters of sales gas (С1);
• ≈ 13 mln tonnes of LNG (С1), up to 3.8 mln tonnes of ethane fraction (С2);
• ≈ up to 1.7 mln tonnes of LPG (С3-С4);
• ≈ 0.1 mln tonnes of pentane-hexane fraction (С5+).
Employer : Gazprom
Contractor : RenCons Heavy Industries
Sector : Petrokimya
Location : Ust-Luga, St. Petersburg, Rusya
Project Duration : 2023 – Ongoing
Project Status : Ongoing
Work Done : Sandblasting and painting works of technological pipes and structural steel materials produced in the factory are carried out.