Rusya’nın Amur Bölgesi Svobodny şehrinde bulunan tesis Rusya’nın en büyük dünyanın sayılı doğal gaz işleme tesisidir. Yılda 42 milyar metreküp doğalgaz üretecek tesis, Yakutistan ve Irkutsky gaz üretim merkezlerinden gelen doğalgazı işleyecektir.
Project Details
Our project, located in Ünlüce location in Sapanca district of Sakarya province of Turkey, started in 2023 and its construction is still continuing.
Employer : Sirius Yapı Trading Joint Stock Company
Contractor : Sirius Yapı Trading Joint Stock Company
Sector : Construction
Location : Sapanca
Project Duration : 2023 – Ongoing
Project Status : Ongoing
Residences Type: Residential, Villa
M2 : 1441,11
Number of Residences : 3
Heating Type : Natural Gas, Underfloor Heating
Project Details
Our project, which is located in Üsküdar district of Istanbul, was started in 2021 and was completed in 2022.
Employer : Sirius Yapı Trading Joint Stock Company
Contractor : Sirius Yapı Trading Joint Stock Company
Sector : Construction
Location : Ünalan District, Üsküdar, İstanbul
Project Duration : 2021 – 2022
Project Status : Completed
Residences Type : Residential, Apartment
M2 : 384,44
Number of Residences : 4
Heating Type : Naturel Gas
Project Detail
The project, whose construction started in the Ezine district of Çanakkale province of Turkey at the beginning of 2021 and was put into operation in the same year, contributes to the sustainable green energy ecosystem by eliminating 270,000 Tons / Year of waste.
As Sirius, all Ezine Biomass Power Plant Start-up Facility Manufacturing & Installation works have been carried out and the power plant has been put into operation.
Employer: Biotrend Energy
Contractor: ITI Engineering
Sector : Power Plant
Location : Ezine – Çanakkale – Türkiye
Project Duration: 2021
Project Status: Completed
License Capacity: 30,000 MW
Work Done:
-
- Biomass Power Plant Start-up Facility Manufacturing & Installation – 289 tons (Pipe & Equipment Installation)
Project Detail
Marmara Ereğlisi LNG Terminal, the construction of which started in 1989 in Marmara Ereğlisi district of Tekirdağ province of Turkey, was put into operation in 1994, and the following capacity increase works were carried out in line with the increasing demand in 2017.
İşveren : BOTAŞ (Boru Hatları İle Petrol Taşıma Anonim Şirketi)
Contractor: Rönesans Industrial Facilities
Sector : LNG – Petrochemicals
Location : Marmara Ereğlisi, Türkiye
Project Duration: 2016 – 2018
Project Status: Completed
Work Done:
-
- Pipe Installation Works – 20,000 Tons WDI
- Equipment Installation – 450 Tons
- Sandblasting and Painting
- All Hat Paint maintenance and repairs
Project Detail
Employer: PhosAgro
Contractor: Mitsubishi Heavy Industries
Sector : Petrochemicals
Location : Cherepovets, Russia
Project Duration: 2014 – 2016
Project Status: Completed
Work Done:
-
- Above Ground Pipe Installation – 14,000 WDI
- Painting Works – A/G Pipelines – 60,000 m2
- Painting Works – Pipe/Cable Carrier & Steel Structure – 750 tons
- Above Ground Offsite Pipe Installation – 55,000 WDI
- Pipeline Labeling (7,000 items) & Equipment (650 items)