Project Detail

The total investment cost of the GTG (Gasoline Production Facility from Natural Gas) project developed in Akhal city, 50 kilometers away from Ashgabat, the capital of Turkmenistan, is 1.5 billion dollars.

The facility, designed and engineered by Japanese Kawasaki Heavy Industries, has an average daily production capacity of 1800 tons and an annual average of 600,0000 tons of gasoline and 100,000 tons of LNG (liquefied natural gas).

Employer: Türkmen Gaz

Contractor : Kawasaki Heavy Industries

Sector : Petrochemicals

Location : Akhal, Turkmenistan

Project Duration: 2014 – 2018

Project Status: Completed

Work Done:

    • Technological Pipe Manufacturing – 107,000 WDI/1,459 tons
    • Above Ground Pipe Installation (Product Storage & Loading Area) – 17,000 WDI
    • Above Ground Pipe Installation (Methanol Storage Site) – 8,000 WDI
    • Above Ground Pipe Installation (Wastewater Treatment) – 6,000 WDI
    • Above Ground Pipe Installation (Water Storage Site) – 9,000 WDI
    • Above Ground Pipe Installation (Water Intake Area) – 1,500 WDI
    • Hydrotesting & Renovation Activities for related works – 440 packages

Türkiye

 Address:  Barbaros Mah. Mor Menekşe Sok. Teknik Yapı Deluxia Suites No: 3/A D: 207 Ataşehir - İstanbul / TÜRKİYE

  Phone: +7 (911) 338-39-29

  E-mail: info@siriusyapi.com.tr

Rusya

 Address: 115407, Moscow, Intraterritory Municipality Nagatinsky Zaton, Nagatinskaya Embankment, Building 54, Premises 2Ц Moskova/Rusya

 E-mail: info@siriuscons.com