Completed Projects

Ezine Biomass Startup Project

Ezine Biomass Startup Project

Project Detail

The project, whose construction started in the Ezine district of Çanakkale province of Turkey at the beginning of 2021 and was put into operation in the same year, contributes to the sustainable green energy ecosystem by eliminating 270,000 Tons / Year of waste.

As Sirius, all Ezine Biomass Power Plant Start-up Facility Manufacturing & Installation works have been carried out and the power plant has been put into operation.

Employer: Biotrend Energy

Contractor: ITI Engineering

Sector : Power Plant

Location : Ezine – Çanakkale – Türkiye

Project Duration: 2021

Project Status: Completed

License Capacity: 30,000 MW

Work Done:

    • Biomass Power Plant Start-up Facility Manufacturing & Installation – 289 tons (Pipe & Equipment Installation)

Marmara Ereğlisi LNG Terminal Capacity Increasing Project

Marmara Ereğlisi LNG Terminal Capacity Increasing Project

Project Detail

Marmara Ereğlisi LNG Terminal, the construction of which started in 1989 in Marmara Ereğlisi district of Tekirdağ province of Turkey, was put into operation in 1994, and the following capacity increase works were carried out in line with the increasing demand in 2017.

İşveren : BOTAŞ (Boru Hatları İle Petrol Taşıma Anonim Şirketi)

Contractor: Rönesans Industrial Facilities

Sector : LNG – Petrochemicals

Location : Marmara Ereğlisi, Türkiye

Project Duration: 2016 – 2018

Project Status: Completed

Work Done:

    • Pipe Installation Works – 20,000 Tons WDI
    • Equipment Installation – 450 Tons
    • Sandblasting and Painting
    • All Hat Paint maintenance and repairs

Phosagro Ammonia Production Facility

Phosagro Ammonia Production Facility

Project Detail

Employer: PhosAgro

Contractor: Mitsubishi Heavy Industries

Sector : Petrochemicals

Location : Cherepovets, Russia

Project Duration: 2014 – 2016

Project Status: Completed

Work Done:

    • Above Ground Pipe Installation – 14,000 WDI
    • Painting Works – A/G Pipelines – 60,000 m2
    • Painting Works – Pipe/Cable Carrier & Steel Structure – 750 tons
    • Above Ground Offsite Pipe Installation – 55,000 WDI
    • Pipeline Labeling (7,000 items) & Equipment (650 items)

Gasoline Production Facility from Natural Gas (GTG) Project

Gasoline Production Facility from Natural Gas (GTG) Project

Project Detail

The total investment cost of the GTG (Gasoline Production Facility from Natural Gas) project developed in Akhal city, 50 kilometers away from Ashgabat, the capital of Turkmenistan, is 1.5 billion dollars.

The facility, designed and engineered by Japanese Kawasaki Heavy Industries, has an average daily production capacity of 1800 tons and an annual average of 600,0000 tons of gasoline and 100,000 tons of LNG (liquefied natural gas).

Employer: Türkmen Gaz

Contractor : Kawasaki Heavy Industries

Sector : Petrochemicals

Location : Akhal, Turkmenistan

Project Duration: 2014 – 2018

Project Status: Completed

Work Done:

    • Technological Pipe Manufacturing – 107,000 WDI/1,459 tons
    • Above Ground Pipe Installation (Product Storage & Loading Area) – 17,000 WDI
    • Above Ground Pipe Installation (Methanol Storage Site) – 8,000 WDI
    • Above Ground Pipe Installation (Wastewater Treatment) – 6,000 WDI
    • Above Ground Pipe Installation (Water Storage Site) – 9,000 WDI
    • Above Ground Pipe Installation (Water Intake Area) – 1,500 WDI
    • Hydrotesting & Renovation Activities for related works – 440 packages

Sibur Zapsib-2 Ethylene Cracking Unit

Sibur Zapsib-2 Ethylene Cracking Unit

Project Detail

The project, the 2nd phase of which was completed in the Tobolsk Region of Russia, was commissioned in 2019 and is a chemical power plant that has become one of the most prestigious industrial projects in Russia with a capacity of 1.5 million tons. In the project, the construction of which started in May 2015, 676 tons of heavy load lifting operations were carried out.

Employer : ZapSibNeftekhim / LINDE

Contractor : Renaissance Heavy Industries

Sector : Petrochemicals

Location : Tobolsk, Russia

Project Duration: 2017 – 2020

Project Status: Completed

Work Done:

    • Above Ground Pipe Installation – 83,500 WDI
    • Painting Works- A/G Pipelines & Support- 170,000 m2
    • Hydrotesting & Renovation Activities for related works – 650 packs
    • Indirect (24 ppl) & Direct (390 ppl) Management for Related Jobs

Bilgin Energy – Natural Gas Combined Cycle Power Plant

Bilgin Energy – Natural Gas Combined Cycle Power Plant

Project Detail

General maintenance and repair works were carried out during the annual shutdown period of Bilgi Enerji Samsun Natural Gas Combined Cycle Power Plant, located in the Terme district of Samsun Province, Turkey, in 2021.

Employer: Bilgin Energy

Contractor : Sirius Industry

Sector : Power Plant

Location : Amur – Terme , Samsun

Project Duration: 2021

Project Status: Completed

Work Done:

    • General maintenance and repair during the annual downtime

Türkiye

 Address:  Barbaros Mah. Mor Menekşe Sok. Teknik Yapı Deluxia Suites No: 3/A D: 207 Ataşehir - İstanbul / TÜRKİYE

  Phone: +7 (911) 338-39-29

  E-mail: info@siriusyapi.com.tr

Rusya

 Address: 115407, Moscow, Intraterritory Municipality Nagatinsky Zaton, Nagatinskaya Embankment, Building 54, Premises 2Ц Moskova/Rusya

 E-mail: info@siriuscons.com

Sirius © 2024 All rights reserved.